Deposits
Charges for installation of meters include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
3/4" or 1"
|
$4,000
|
2"
|
$4,500
|
4"
|
$8,000
|
6"
|
$10,000
|
There is a fee for a water service disconnection from the mainline deposit.
Charges for disconnection include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
Water Disconnection from the Mainline (Deposit): $3,500