Electric Standards and Forms

Electric Standards and Forms
Resources
The following is an index of Electric Standard diagrams. Each link contains a full-page diagram.

Standard

Description

Date Approved

ED-1 General construction notes February 26, 2013
ED-2 General notes for obtaining electrical services February 26, 2013
ED-3 Conduit / duct cross section May 8, 2003
ED-4 Grounding detail for UG primary structures May 8, 2003
ED-5 Riser pole detail May 8, 2003
ED-6 4'x4.5' single phase transformer pad and 17"x30" PB May 8, 2003
ED-7 6'x8'6" transformer pad with 4'x7' enclosure by 42" deep May 8, 2003
ED-8 8'x10' transformer pad with 4'x7' enclosure by 42" deep May 8, 2003
ED-9 10'x12' transformer pad with 5'x8' enclosure by 60" deep May 8, 2003
ED-10 Switch slab box May 8, 2003
ED-11 Street light handhole and cover - 12"x22"x18" May 8, 2003
ED-12 Secondary pullbox and cover - 17"x30"x18" May 8, 2003
ED-13 Pullbox and cover 2'x3' September 25, 2013
ED-14 3'x5' pullbox with spring assisted hinged cover May 8, 2003
ED-15 4'x6' pullbox with spring assisted hinged cover May 8, 2003
ED-16 6'x8'x7' vault with 4'x5' opening May 8, 2003
ED-17 6'x10'x7' vault with 4'x5' opening May 8, 2003
ED-18 6'x12'x7' vault with 4'x5' opening May 8, 2003
ED-19 Protective bollards for pad mount equipment May 8, 2003
ED-20 Street light September 25, 2013
ED-21 4'x5' traffic vault neck with concrete cover May 8, 2003
ED-22 Residential meter panel 200 amperes max. installation requirements April 20, 2015
ED-23 Temporary Overhead Services October 20, 2008
ED-24 Temporary Underground Services October 20, 2008
ED-25 Requirements for Customers with Photovoltaic Generator June 2, 2015 
ED-26 Clearance Requirements Around Pad Mount Transformer  February 26, 2013
Banner App Banner Display Application Kit  July 27, 2009
Temp Service App
 Temporary Service Application
July 2, 2015